Wastewater treatment plants

you will read...

Urban and Industrial Wastewater Treatment Plants

Arya Tadbir Pazh offers comprehensive services in the field of human sanitary wastewater treatment, including the design, consulting, construction, operation, and turnkey EPC of concrete wastewater treatment plants. These plants are designed to handle various wastewater flow rates, including:

  • Domestic wastewater and small communities
  • Urban wastewater

In terms of treated wastewater quality, concrete wastewater treatment plants are designed and constructed to meet the standards set by the Environmental Protection Agency or the specific requirements of the client for the reuse of reclaimed water.

تصویه خانه شهری و صنعتی - آریا تدبیر پاژ

Construction and Implementation of Concrete Sanitary Wastewater Treatment Plants

The construction of reinforced concrete wastewater treatment plants typically involves two main parts:

Construction of the concrete wastewater treatment plant structure

The construction of the treatment plant structure requires a comprehensive execution plan, including dimensions of tanks, reinforcement drawings, locations of plates, nozzles, water stops, and more. During the construction of the treatment plant structure, it is essential to consider the equipment that will be installed in the designated locations when designing all structures and related accessories. Note: Watertightness of the treatment plant structure is one of the most critical aspects of construction. Particular attention should be paid during concrete pouring and curing to prevent the formation of honeycombed surfaces and hairline cracks in the concrete. If, after completion of the treatment plant structure, it is determined that the tanks are not adequately watertight, various waterproofing methods and materials such as grout, penetrating sealers, and polymeric waterstops must be used to completely seal the tanks.

Fabrication, Transportation, Installation, and Commissioning of Equipment

  • 1
    Installation of all steel structures: including access bridges, rotary and movable bridges, railings, guards, inspection hatches, pipe and duct supports, ladders, access platforms, etc.
  • 2
    Installation of all electromechanical equipment: including pumps, blowers, compressors, dosing packages, motors, mixers, etc.
  • 3
    Execution of all piping and cabling works
  • 4
    Installation of control and power panels
  • 5
    Dry commissioning of all wastewater treatment plant equipment
  • 6
    Transfer of wastewater from the equalization tank to the treatment plant units and carrying out the temporary commissioning of the treatment plant

After commissioning and handing over the treatment plant, all necessary training must be provided to the operating team nominated by the client.

For consulting services related to the construction, implementation, and startup of concrete human sanitary wastewater treatment plants, please contact our experts at Arya Tadbir Pazh!